Case Study: Construction Site – 30 Cabins

Curious to know what hydrogen deployment metrics look like?

We have created a hypothetical scenario to demonstrate the requirements and benefits of replacing a diesel generator with hydrogen.

Job Details

Characteristics: Continuous, variable load.

Typical Generator Size: 200kVA

Job Length: 365 Days

What Will Be Powered: 30 cabins which includes – Welfare, toilets, office, meeting, drying rooms, canteen with kitchenette.

Running Hours (Weekly): 48

Job Scenario

A medium sized construction site with a rotation of professionals that require cabins to accommodate needs for toilets, eating, office and meeting space as well as drying rooms.

Site Preparation: 6 Hours | Commissioning: 8 Hours | Decommissioning: 6 Hours

Job Requirements (Weekly)

Total kWh: 3,174

Base kW: 66

Peak kW: 165

Hydrogen (kg): 190

Diesel Comparison (Weekly)

Diesel Used (liters): 1,568

Avg Diesel Generator Efficiency: 18%

CO2 Diesel Emissions (kg): 5,170

Environmental Benefits

0 kg

CO2e Saved

What is required for a deployment

Hydrogen generator deployments, currently, require additional steps and processes when compared to diesel.

At Hydrologiq we ensure that all deployments run smoothly by providing our advisory and managed deployment services. Our experience, expertise and network provide you with the easiest way to get hydrogen deployed today.

Here are just a few of the steps we take:

Skills & People
  • Technical Site Operations
  • Refuelling
  • Monitoring
  • Insurance
Health & Safety
  • Compound Emergency Plan
  • DSEAR
  • Generator/Hydrogen Lift Plan
  • RAMS
  • Compound Design
Suppliers
  • Procure hydrogen generator and deliver to the location
  • Schedule fuel delivery to ensure no down time.
Site Activities
  • Commission/Decommission
  • On-Site Fuel Handling
  • Site Evaluation Visits
  • Remote Monitoring
eodev hydrogen fuel cell generator

Learn about our deployments

Hydrologiq Deploys Hydrogen Generator with Costain

Hydrologiq has added another successful trial to a growing list of hydrogen genset deployments. This time it was with Costain on the Preston Western Distributor Road.

hydrologiq hydrogen generators

Hydrologiq Ltd

7 Randall Lane

Bishop’s Stortford

CM23 1ET

Company no: 12449466

Recent Features


hydrologiq hydrogen generators

© 2021 HYDROLOGIQ LTD | Company Number: 12449466 | Terms & ConditionsPrivacy Policy

© 2021 HYDROLOGIQ LTD

Company Number: 12449466

Privacy Policy

Hydrologiq Ltd

York Hub

Peter Lane

York

YO1 8SU

Company no: 12449466

Recent Features


hydrologiq hydrogen generators

© 2023 HYDROLOGIQ LTD | Company Number: 12449466 | Terms & ConditionsPrivacy Policy

© 2021 HYDROLOGIQ LTD

Company Number: 12449466

Privacy Policy

Account Login