Curious to know what hydrogen deployment metrics look like?
We have created a hypothetical scenario to demonstrate the requirements and benefits of replacing a diesel generator with hydrogen.
Characteristics: Continuous, variable load.
Typical Generator Size: 200kVA
Job Length: 365 Days
What Will Be Powered: 30 cabins which includes – Welfare, toilets, office, meeting, drying rooms, canteen with kitchenette.
Running Hours (Weekly): 48
A medium sized construction site with a rotation of professionals that require cabins to accommodate needs for toilets, eating, office and meeting space as well as drying rooms.
Site Preparation: 6 Hours | Commissioning: 8 Hours | Decommissioning: 6 Hours
Total kWh: 3,174
Base kW: 66
Peak kW: 165
Hydrogen (kg): 190
Diesel Used (liters): 1,568
Avg Diesel Generator Efficiency: 18%
CO2 Diesel Emissions (kg): 5,170
CO2e Saved
Hydrogen generator deployments, currently, require additional steps and processes when compared to diesel.
At Hydrologiq we ensure that all deployments run smoothly by providing our advisory and managed deployment services. Our experience, expertise and network provide you with the easiest way to get hydrogen deployed today.
Here are just a few of the steps we take:
Learn about our deployments
Hydrologiq has added another successful trial to a growing list of hydrogen genset deployments. This time it was with Costain on the Preston Western Distributor Road.