Characteristics: Intermittent, variable load
Typical Generator Size: 100kVA
Job Length: 8 Days
What Will Be Powered: Welfare units, meeting rooms, toilet units and drying rooms.
Operational Hours: Full Event
Off grid event that requires power generation for hospitality units that will be used by the staff at the event for breaks and refreshment purposes.
Site Preparation: 8 Hours
Total kWh: 1,600
Base kW: 26
Peak kWh: 84
Hydrogen (kg): 97
Diesel Used (liters): 800
Diesel Efficiency: 15%
Diesel Emissions (kg): 2640
CO2e Saved
Hydrogen generator deployments, currently, require additional steps and processes when compared to diesel.
At Hydrologiq we ensure that all deployments run smoothly by providing our advisory and managed deployment services. Our experience, expertise and network provide you with the easiest way to get hydrogen deployed today.
Here are just a few of the steps we take:
Learn more about our deployments
A 100kVA hydrogen generator powered the public transport hub at top-ten UK festival, Boomtown Fair. Together, Boomtown and Hydrologiq are demonstrating how hydrogen can provide power solutions today, and significantly decarbonise festival power in the future.
Account Login