Curious to know what hydrogen deployment metrics look like?
We have created a hypothetical scenario to demonstrate the requirements and benefits of replacing a diesel generator with hydrogen.
Characteristics: Continuous, variable load
Typical Generator Size: 100kVA
Job Length: 365 Days
What Will Be Powered: Site office, canteen, toilets, drying room & 2 BEV car chargers
Running Hours (Weekly): 48
A satellite construction compound is smaller than the main site and offers welfare units as well as office space for a small number of workers involved in the construction process.
Site Preparation: 6 Hours | Commissioning: 6 Hours | Decommissioning: 4 Hours
Total kWh: 1,770
Base kW: 5.8
Peak kW: 19.5
Hydrogen (kg): 115
Diesel Used (liters): 880
Diesel Efficiency: 18%
CO2 Diesel Emissions (kg): 2,913
CO2e Saved
Hydrogen generator deployments, currently, require additional steps and processes when compared to diesel.
At Hydrologiq we ensure that all deployments run smoothly by providing our advisory and managed deployment services. Our experience, expertise and network provide you with the easiest way to get hydrogen deployed today.
Here are just a few of the steps we take:
Learn about our deployments
Hydrologiq has added another successful trial to a growing list of hydrogen genset deployments. This time it was with Costain on the Preston Western Distributor Road.