Curious to know what hydrogen deployment metrics look like?
We have created a hypothetical scenario to demonstrate the requirements and benefits of replacing a diesel generator with hydrogen.
Characteristics: Versatile, can power multiple types of electric plant over construction phase.
Typical Generator Size: 200kVA
Job Length: 180 Days
What Will Be Powered: Electric wheel loader (40kW), electric pile driver (396kW) and electric compact excavator (16kW)
Running Hours (Weekly): 36
Recharging electric plant machinery, on-site, after a full days of operations (5 – 8 hours) with a hydrogen generator compared to using a diesel generator.
4.8 Recharges (Wheel Loader): 180kWh
4.8 Recharges (Excavator): 104kWh
4.8 Recharges (Pile Driver): 9,648kWh
Diesel Used (liters): 3,304
Diesel Efficiency: 15%
Diesel Emissions (kg): 10,903
CO2e Saved
Hydrogen generator deployments, currently, require additional steps and processes when compared to diesel.
At Hydrologiq we ensure that all deployments run smoothly by providing our advisory and managed deployment services. Our experience, expertise and network provide you with the easiest way to get hydrogen deployed today.
Here are just a few of the steps we take:
Learn about our deployments
Hydrologiq has added another successful trial to a growing list of hydrogen genset deployments. This time it was with Costain on the Preston Western Distributor Road.
CONTACT
Account Login